  1. 1931

    The Start of the Journey

    The story of Energy Infrastructures Ltd., started in the 1930s, during the British Mandate in the Land of Israel.  Even then, the Haifa Port area was recognized for its strategic and economic importance, given its location as a key hub exporting petroleum and its derivatives. In 1931, an agreement was signed between the British High Commissioner and the Iraq Petroleum Company (I.P.C.), to lay an underground pipeline for transporting crude oil from Iraq, via Transjordan, to Haifa from where it would be exported in marine tankers. 

  2. 1934

    Laying the Infrastructure and Establishing a Storage System

    IPC completed the laying of the underground pipeline segment from Kirkuk, Iraq, to Haifa alongside the construction of the Haifa Oil Refinery.  These steps laid the foundation for an extensive infrastructure grid in the Haifa Bay, that included storage facilities, a network of fuel and refined product pipelines, and marine terminals. Most of this infrastructure is still being used by Energy Infrastructures Ltd., today.

  3. 1950

    The Arab boycott of the State of Israel

    Following the Arab boycott of the State of Israel, and the subsequent total withdrawal of the British, the Israeli Government established National Petroleum Services, stepping into the shoes of the British company to operate the infrastructures on behalf of the State.

    With the development of the Israeli economy and the expansion of economic and industrial operations in the center and south of the country, there was an increasing need to construct new fuel terminals, expand the transmission pipelines and increase storage capabilities.

    During this period, essential fuel infrastructure was deployed throughout Israel which, to this day, constitutes a key foundation for the country’s energy security. 
     

  4. 1990

    The Operational Arm of the State of Israel

    Over the years, the company evolved into the leading infrastructure provider for the fuel and energy sector of the State of Israel. As a result, its name was changed from National Petroleum Services to the Petroleum and Energy Infrastructures Ltd., a status that illustrates its national standing and role.

  5. 2021

    A Look into an Evolving Future

    The company continuously analyzes both local and global energy trends, climate challenges and global changes. Recognizing that fossil energy sources are losing their dominance and that preparation for alternative fuels and clean energies is required, the company has formulated a new strategic program which includes entry into advanced energy fields.  As part of this concept, the company’s name was changed to Energy Infrastructures Ltd.

  6. 2025

    Looking Forward – the Next Generation of Energy Infrastructures Ltd.

    As part of its preparation for the coming decades, Energy Infrastructures Ltd., is advancing the next generation of national infrastructures for the Israeli energy sector. Key projects include:

    • Developing new petrol ports in Haifa and Ashdod
    • Establishing advanced storage farms, including underground storage solutions
    • Upgrading and expanding the national fuel pipeline grid
    • Increasing the capacity, reliability and resilience of the economy’s critical infrastructure 

    These steps are designed to strengthen the country’s energy backbone and ensure a long-term stable, continuous and reliable energy supply.